GEPCO Solar Net Metering Guide & Rates (2026)

Learn how to sell excess solar electricity back to Gujranwala Electric Power Company (GEPCO) grid using bi-directional green meters under NEPRA Net Metering Regulations.

What is GEPCO Net Metering?

GEPCO Net Metering is a billing mechanism that allows residential, commercial, and industrial electricity consumers equipped with solar PV systems (5 kW to 1 MW) to export surplus solar energy back to the GEPCO grid. In return, GEPCO credits your account at NEPRA approved buy-back rates, offsetting your monthly electricity bill.

Eligibility Criteria for Solar Net Metering

  • 3-Phase Connection Required: Net metering requires a 3-phase electricity connection. Single-phase connections must be upgraded to 3-phase first.
  • Sanctioned Load Capacity: Your installed solar inverter capacity (kW) must not exceed your GEPCO sanctioned load limit.
  • NEPRA Approved Solar Vendor: Solar panels and on-grid inverters must be installed by a Category C-1 or C-2 AEDB (Alternative Energy Development Board) licensed installer.

Required Documents Checklist

  1. Attested copy of CNIC of the connection owner.
  2. Copy of latest paid GEPCO bill verified via our Online Bill Checker.
  3. AEDB licensed solar installer installation certificate and single-line diagram (SLD).
  4. Technical datasheets of installed solar panels and grid-tied inverter.
  5. NOC certificate issued by GEPCO Executive Engineer (XEN).

Step-by-Step GEPCO Net Metering Application Process

  1. Application Submission: Submit standard Schedule-I application form along with technical drawings to your local GEPCO XEN office.
  2. Technical Inspection: GEPCO technical team inspects your solar inverter specifications, earth grounding, and islanding protection relay.
  3. NEPRA License Issuance: GEPCO forwards your application to NEPRA for net metering generation license approval.
  4. Bi-Directional Green Meter Installation: Once approved, pay the green meter cost demand notice. GEPCO tests and replaces your standard meter with a bi-directional green meter.
  5. Net Metering Agreement: Sign the 3-year renewable net metering contract with GEPCO.